Triple
T7255543
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | R5 Paoli |
E157710
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former transit line designation |
C15590
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former transit line designation Context triple: [R5 Paoli, instanceOf, former transit line designation]
-
A.
former transit line
chosen
A former transit line is a previously operational public transportation route, such as a bus, tram, or rail line, that has been permanently discontinued or replaced.
-
B.
former state highway designation
A former state highway designation is an official route number or name that was once assigned to a state-maintained roadway but has since been removed, reassigned, or decommissioned from the state highway system.
-
C.
historical transit operating division
A historical transit operating division is an organizational unit within a past or legacy public transportation system responsible for managing and coordinating transit services, personnel, and resources within a specific geographic area or operational domain.
-
D.
former Los Angeles Metro Rail line
A former Los Angeles Metro Rail line is a previously operated light rail or rapid transit route within the Los Angeles Metro Rail system that has since been discontinued, restructured, or replaced.
-
E.
former name of railway station
A former name of a railway station is a historical designation previously used to identify a specific station before it was officially renamed or rebranded.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6882d81d4819085f7ff862951ee4f |
completed | March 27, 2026, 1:37 p.m. |
Created at: March 27, 2026, 2:56 p.m.