Triple

T7252101
Position Surface form Disambiguated ID Type / Status
Subject Environment Protection Act of India E157626 entity
Predicate authorizes P273 FINISHED
Object Central Government to stop or regulate supply of electricity or water to industries
The Central Government to stop or regulate supply of electricity or water to industries is a statutory power under Indian environmental law that allows the federal authority to curb or control utilities to industrial units as a means of enforcing pollution control and environmental protection standards.
E651263 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Central Government to stop or regulate supply of electricity or water to industries | Statement: [Environment Protection Act of India, authorizes, Central Government to stop or regulate supply of electricity or water to industries]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Central Government to stop or regulate supply of electricity or water to industries
Context triple: [Environment Protection Act of India, authorizes, Central Government to stop or regulate supply of electricity or water to industries]
  • A. Central Authority for electricity
    The Central Authority for Electricity was a UK governmental body responsible for overseeing and coordinating the generation and supply of electricity at a national level.
  • B. Ministry of Power (India)
    The Ministry of Power (India) is the central government body responsible for overseeing the development, regulation, and policy framework of the country’s electricity and power sector.
  • C. Power Industries Division
    The Power Industries Division is a specialist branch of the Institution of Mechanical Engineers focused on advancing engineering practice and knowledge in the power and energy sectors.
  • D. Electricity Act 1957
    The Electricity Act 1957 is a UK statute that reorganized the electricity supply industry, notably establishing the Central Electricity Generating Board and revising the structure and regulation of electricity generation and distribution.
  • E. Ministry of Fuel and Power
    The Ministry of Fuel and Power was a former UK government department responsible for overseeing and regulating the nation’s energy resources, particularly coal, during and after the Second World War.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Central Government to stop or regulate supply of electricity or water to industries
Triple: [Environment Protection Act of India, authorizes, Central Government to stop or regulate supply of electricity or water to industries]
Generated description
The Central Government to stop or regulate supply of electricity or water to industries is a statutory power under Indian environmental law that allows the federal authority to curb or control utilities to industrial units as a means of enforcing pollution control and environmental protection standards.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Central Government to stop or regulate supply of electricity or water to industries
Target entity description: The Central Government to stop or regulate supply of electricity or water to industries is a statutory power under Indian environmental law that allows the federal authority to curb or control utilities to industrial units as a means of enforcing pollution control and environmental protection standards.
  • A. Central Authority for electricity
    The Central Authority for Electricity was a UK governmental body responsible for overseeing and coordinating the generation and supply of electricity at a national level.
  • B. Ministry of Power (India)
    The Ministry of Power (India) is the central government body responsible for overseeing the development, regulation, and policy framework of the country’s electricity and power sector.
  • C. Power Industries Division
    The Power Industries Division is a specialist branch of the Institution of Mechanical Engineers focused on advancing engineering practice and knowledge in the power and energy sectors.
  • D. Electricity Act 1957
    The Electricity Act 1957 is a UK statute that reorganized the electricity supply industry, notably establishing the Central Electricity Generating Board and revising the structure and regulation of electricity generation and distribution.
  • E. Ministry of Fuel and Power
    The Ministry of Fuel and Power was a former UK government department responsible for overseeing and regulating the nation’s energy resources, particularly coal, during and after the Second World War.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6882d81d4819085f7ff862951ee4f completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6ea7ae0e48190bd80c91bad1976c6 completed March 27, 2026, 8:37 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7d3a7502081909d2a97a60cc445ae completed March 28, 2026, 1:12 p.m.
NEDg Description generation batch_69c7d4690adc81909abbfb7a756f453d completed March 28, 2026, 1:15 p.m.
NED2 Entity disambiguation (via description) batch_69c7d517a7108190893878cbef7d1a3a completed March 28, 2026, 1:18 p.m.
Created at: March 27, 2026, 2:56 p.m.