Triple
T7252101
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Environment Protection Act of India |
E157626
|
entity |
| Predicate | authorizes |
P273
|
FINISHED |
| Object |
Central Government to stop or regulate supply of electricity or water to industries
The Central Government to stop or regulate supply of electricity or water to industries is a statutory power under Indian environmental law that allows the federal authority to curb or control utilities to industrial units as a means of enforcing pollution control and environmental protection standards.
|
E651263
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Central Government to stop or regulate supply of electricity or water to industries | Statement: [Environment Protection Act of India, authorizes, Central Government to stop or regulate supply of electricity or water to industries]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Central Government to stop or regulate supply of electricity or water to industries Context triple: [Environment Protection Act of India, authorizes, Central Government to stop or regulate supply of electricity or water to industries]
-
A.
Central Authority for electricity
The Central Authority for Electricity was a UK governmental body responsible for overseeing and coordinating the generation and supply of electricity at a national level.
-
B.
Ministry of Power (India)
The Ministry of Power (India) is the central government body responsible for overseeing the development, regulation, and policy framework of the country’s electricity and power sector.
-
C.
Power Industries Division
The Power Industries Division is a specialist branch of the Institution of Mechanical Engineers focused on advancing engineering practice and knowledge in the power and energy sectors.
-
D.
Electricity Act 1957
The Electricity Act 1957 is a UK statute that reorganized the electricity supply industry, notably establishing the Central Electricity Generating Board and revising the structure and regulation of electricity generation and distribution.
-
E.
Ministry of Fuel and Power
The Ministry of Fuel and Power was a former UK government department responsible for overseeing and regulating the nation’s energy resources, particularly coal, during and after the Second World War.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Central Government to stop or regulate supply of electricity or water to industries Triple: [Environment Protection Act of India, authorizes, Central Government to stop or regulate supply of electricity or water to industries]
Generated description
The Central Government to stop or regulate supply of electricity or water to industries is a statutory power under Indian environmental law that allows the federal authority to curb or control utilities to industrial units as a means of enforcing pollution control and environmental protection standards.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Central Government to stop or regulate supply of electricity or water to industries Target entity description: The Central Government to stop or regulate supply of electricity or water to industries is a statutory power under Indian environmental law that allows the federal authority to curb or control utilities to industrial units as a means of enforcing pollution control and environmental protection standards.
-
A.
Central Authority for electricity
The Central Authority for Electricity was a UK governmental body responsible for overseeing and coordinating the generation and supply of electricity at a national level.
-
B.
Ministry of Power (India)
The Ministry of Power (India) is the central government body responsible for overseeing the development, regulation, and policy framework of the country’s electricity and power sector.
-
C.
Power Industries Division
The Power Industries Division is a specialist branch of the Institution of Mechanical Engineers focused on advancing engineering practice and knowledge in the power and energy sectors.
-
D.
Electricity Act 1957
The Electricity Act 1957 is a UK statute that reorganized the electricity supply industry, notably establishing the Central Electricity Generating Board and revising the structure and regulation of electricity generation and distribution.
-
E.
Ministry of Fuel and Power
The Ministry of Fuel and Power was a former UK government department responsible for overseeing and regulating the nation’s energy resources, particularly coal, during and after the Second World War.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6882d81d4819085f7ff862951ee4f |
completed | March 27, 2026, 1:37 p.m. |
| NER | Named-entity recognition | batch_69c6ea7ae0e48190bd80c91bad1976c6 |
completed | March 27, 2026, 8:37 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c7d3a7502081909d2a97a60cc445ae |
completed | March 28, 2026, 1:12 p.m. |
| NEDg | Description generation | batch_69c7d4690adc81909abbfb7a756f453d |
completed | March 28, 2026, 1:15 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69c7d517a7108190893878cbef7d1a3a |
completed | March 28, 2026, 1:18 p.m. |
Created at: March 27, 2026, 2:56 p.m.