Triple

T7252039
Position Surface form Disambiguated ID Type / Status
Subject National Ganga Council E157625 entity
Predicate instanceOf P0 FINISHED
Object river basin management institution C11425 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: river basin management institution
Context triple: [National Ganga Council, instanceOf, river basin management institution]
  • A. river basin organization chosen
    A river basin organization is an institutional body responsible for coordinating the management, development, and protection of water and related resources within a defined river basin across sectors and jurisdictions.
  • B. water management agency
    A water management agency is an organization responsible for planning, regulating, and overseeing the sustainable allocation, use, and protection of water resources within a defined region.
  • C. water management structure
    A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
  • D. flood control agency
    A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
  • E. river basin
    A river basin is the land area drained by a river and all its tributaries, bounded by topographic divides that separate it from adjacent basins.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6882d81d4819085f7ff862951ee4f completed March 27, 2026, 1:37 p.m.
Created at: March 27, 2026, 2:56 p.m.