Triple
T7237529
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dry Dock No. 3 |
E155267
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 19th-century infrastructure |
C20963
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 19th-century infrastructure Context triple: [Dry Dock No. 3, instanceOf, 19th-century infrastructure]
-
A.
19th-century bridge
A 19th-century bridge is a transportation structure built during the 1800s that typically reflects the era’s industrial advances in materials and engineering, such as iron, steel, and improved masonry techniques.
-
B.
19th-century state
A 19th-century state is a politically organized territorial entity that operated within the 1800s, shaped by industrialization, nationalism, imperial expansion, and evolving concepts of sovereignty and citizenship.
-
C.
19th-century work
A 19th-century work is any creative, intellectual, or artistic production—such as a book, painting, musical composition, or scientific treatise—created or first published between 1801 and 1900.
-
D.
19th-century industrial enterprise
A 19th-century industrial enterprise is a large-scale, mechanized business organization that harnesses steam power, factory production, and wage labor to mass-produce goods within emerging capitalist markets.
-
E.
19th-century invention
A 19th-century invention is a technological or mechanical creation developed between 1801 and 1900 that significantly influenced industrial, social, or scientific progress of that era.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c688143bfc81908d4176617735e601 |
completed | March 27, 2026, 1:37 p.m. |
Created at: March 27, 2026, 2:55 p.m.