Triple

T7190747
Position Surface form Disambiguated ID Type / Status
Subject Seven Islands of Bombay E167682 entity
Predicate reclamationMajorPhase P46160 FINISHED
Object 19th century LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 19th century | Statement: [Seven Islands of Bombay, reclamationMajorPhase, 19th century]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: reclamationMajorPhase
Context triple: [Seven Islands of Bombay, reclamationMajorPhase, 19th century]
  • A. majorPhase chosen
    Indicates that one phase is a primary or dominant stage within a larger process, lifecycle, or sequence.
  • B. majorPhaseCompletion
    Indicates that a significant or primary phase of a larger process, project, or lifecycle has been fully completed.
  • C. majorRebuilder
    Indicates that an entity plays a primary or leading role in reconstructing, restoring, or significantly rebuilding another entity.
  • D. majorRebuildCompleted
    Indicates that a significant reconstruction or overhaul of an entity has been fully completed.
  • E. mainPhase
    Indicates that an event, action, or state occurs during the primary or central phase of a larger process or sequence.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6888b5248819090499a884ee3ec39 completed March 27, 2026, 1:39 p.m.
NER Named-entity recognition batch_69c6e90087208190a65e49ae0e8a7cbf completed March 27, 2026, 8:30 p.m.
PD Predicate disambiguation batch_69c6e752385c819096fbab55566ee2a8 completed March 27, 2026, 8:23 p.m.
Created at: March 27, 2026, 2:50 p.m.