Triple

T7188560
Position Surface form Disambiguated ID Type / Status
Subject Clean Air Interstate Rule E167629 entity
Predicate finalRuleYear P2233 FINISHED
Object 2005 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2005 | Statement: [Clean Air Interstate Rule, finalRuleYear, 2005]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: finalRuleYear
Context triple: [Clean Air Interstate Rule, finalRuleYear, 2005]
  • A. assumedRuleYear
    Indicates the year in which a particular rule, regulation, or policy is assumed to take effect or be applicable.
  • B. finalPerformanceYear
    Indicates the year in which an entity’s performance or activity is recorded or recognized for the last time.
  • C. yearDecided chosen
    Indicates the specific calendar year in which a decision, ruling, or resolution was formally made or finalized.
  • D. effectiveYear
    Indicates the calendar year in which something (such as a rule, status, or agreement) becomes valid or takes effect.
  • E. endYear
    Indicates the year in which an event, state, or relationship comes to an end.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6888b5248819090499a884ee3ec39 completed March 27, 2026, 1:39 p.m.
NER Named-entity recognition batch_69c6e8e3d9188190ba2792098d76fb86 completed March 27, 2026, 8:30 p.m.
PD Predicate disambiguation batch_69c6e752385c819096fbab55566ee2a8 completed March 27, 2026, 8:23 p.m.
Created at: March 27, 2026, 2:50 p.m.