Triple

T7175914
Position Surface form Disambiguated ID Type / Status
Subject Mühendishane-i Bahrî-i Hümâyûn E167318 entity
Predicate instanceOf P0 FINISHED
Object naval engineering school C16394 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: naval engineering school
Context triple: [Mühendishane-i Bahrî-i Hümâyûn, instanceOf, naval engineering school]
  • A. naval arsenal
    A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
  • B. naval shore establishment
    A naval shore establishment is a land-based facility that supports a navy’s operations, administration, training, logistics, and maintenance away from seagoing vessels.
  • C. naval office
    A naval office is an administrative entity within a navy responsible for managing operations, logistics, personnel, and documentation related to maritime military activities.
  • D. naval training base chosen
    A naval training base is a dedicated military facility where naval personnel receive instruction, practice, and preparation in seamanship, warfare, and support operations.
  • E. naval administrative office
    A naval administrative office is an organizational unit responsible for managing the paperwork, personnel records, logistics, and regulatory compliance that support the operations of a navy or naval installation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68889a2748190a316c5e65360361a completed March 27, 2026, 1:39 p.m.
Created at: March 27, 2026, 2:48 p.m.