Triple

T7165169
Position Surface form Disambiguated ID Type / Status
Subject Lusoponte E167047 entity
Predicate operates P24 FINISHED
Object 25 de Abril Bridge E31874 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 25 de Abril Bridge | Statement: [Lusoponte, operates, 25 de Abril Bridge]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 25 de Abril Bridge
Context triple: [Lusoponte, operates, 25 de Abril Bridge]
  • A. 25 de Abril Bridge chosen
    The 25 de Abril Bridge is a large suspension bridge in Lisbon, Portugal, often compared to San Francisco’s Golden Gate Bridge for its similar appearance and iconic status.
  • B. Dom Luís I Bridge
    Dom Luís I Bridge is a double-deck iron arch bridge spanning the Douro River in Porto, Portugal, renowned as one of the city’s most iconic landmarks.
  • C. Braga Bridge
    The Braga Bridge is a major steel truss highway bridge carrying Interstate 195 over the Taunton River in Fall River, Massachusetts.
  • D. Costa e Silva Bridge
    The Costa e Silva Bridge is a major modernist road bridge in Brasília, Brazil, connecting key parts of the city across Lake Paranoá.
  • E. São João Railway Bridge
    The São João Railway Bridge is a modern railway bridge in Porto, Portugal, built to carry rail traffic across the Douro River after the decommissioning of the historic Maria Pia Bridge.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68888c10c819095e0383020225758 completed March 27, 2026, 1:39 p.m.
NER Named-entity recognition batch_69c6e832d2548190aacff0de80dbc268 completed March 27, 2026, 8:27 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7b901cb608190acd25c22b38a1957 completed March 28, 2026, 11:18 a.m.
Created at: March 27, 2026, 2:47 p.m.