Triple

T7141399
Position Surface form Disambiguated ID Type / Status
Subject Red Line Northwest Extension corridor E166449 entity
Predicate instanceOf P0 FINISHED
Object planned transit corridor C21436 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned transit corridor
Context triple: [Red Line Northwest Extension corridor, instanceOf, planned transit corridor]
  • A. transport corridor
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • B. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • C. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • D. freight rail corridor
    A freight rail corridor is a designated railway route primarily used for the efficient, high-capacity movement of goods and cargo between industrial, commercial, and logistics hubs.
  • E. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6888579d481909e05a8d6b81bf733 completed March 27, 2026, 1:39 p.m.
Created at: March 27, 2026, 2:45 p.m.