Triple

T7134950
Position Surface form Disambiguated ID Type / Status
Subject Donji Grad E166282 entity
Predicate contains P35 FINISHED
Object Zagreb Main Railway Station E161311 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Zagreb Main Railway Station | Statement: [Donji Grad, contains, Zagreb Main Railway Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Zagreb Main Railway Station
Context triple: [Donji Grad, contains, Zagreb Main Railway Station]
  • A. Zagreb Glavni kolodvor chosen
    Zagreb Glavni kolodvor is the main railway station and central rail hub of Croatia’s capital city, serving domestic and international train connections.
  • B. Ljubljana Railway Station
    Ljubljana Railway Station is the main railway hub of Slovenia’s capital city, serving as a central point for national and international train connections.
  • C. Nova Gorica railway station
    Nova Gorica railway station is the main rail transport hub serving the town of Nova Gorica in western Slovenia, near the Italian border.
  • D. Maribor railway station
    Maribor railway station is the main passenger and freight rail hub serving the city of Maribor in northeastern Slovenia.
  • E. Zagreb tram network
    The Zagreb tram network is an extensive urban light rail system that serves as the backbone of public transportation in Croatia’s capital city.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68884a9388190af42f90d1c1a7151 completed March 27, 2026, 1:39 p.m.
NER Named-entity recognition batch_69c6e690f954819084b81a555f4cdb5e completed March 27, 2026, 8:20 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7a344fb4881908f6b6e33706e0192 completed March 28, 2026, 9:45 a.m.
Created at: March 27, 2026, 2:45 p.m.