Triple
T7115090
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Yastrebets gondola lift upper station |
E165797
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mountain transport infrastructure |
C12728
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mountain transport infrastructure Context triple: [Yastrebets gondola lift upper station, instanceOf, mountain transport infrastructure]
-
A.
mountain trail
A mountain trail is a marked or worn path through mountainous terrain designed for hiking, climbing, or traversing varying elevations and natural features.
-
B.
mountain pass
A mountain pass is a navigable route through a mountain range or over a ridge that provides a lower and more accessible crossing point between valleys or regions.
-
C.
mountain
A mountain is a large natural elevation of the Earth's surface rising prominently above its surroundings, typically with steep sides and a significant height relative to nearby terrain.
-
D.
mountain station
chosen
A mountain station is a facility or settlement located at a high elevation in mountainous terrain, typically serving as a base for transportation, research, tourism, or outdoor activities.
-
E.
transport infrastructure network
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6888227bc8190a1394679e3116f90 |
completed | March 27, 2026, 1:39 p.m. |
Created at: March 27, 2026, 2:43 p.m.