Triple

T7107256
Position Surface form Disambiguated ID Type / Status
Subject Temple I E165618 entity
Predicate constructionEndTime P52553 FINISHED
Object 8th century LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 8th century | Statement: [Temple I, constructionEndTime, 8th century]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionEndTime
Context triple: [Temple I, constructionEndTime, 8th century]
  • A. constructionTime
    Indicates the duration or specific point in time required to construct or build an entity.
  • B. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • C. constructionCompletedUnder
    Indicates that the completion of a construction project occurred under the responsibility, authority, or supervision of a specified agent, organization, or governing body.
  • D. commissioningEndDate
    Indicates the date on which the commissioning process or commissioning-related responsibilities are completed or terminated.
  • E. buildPeriodEnd chosen
    Indicates the point in time at which a construction or building phase is considered completed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6888120f081908f8f01b201dc4a4c completed March 27, 2026, 1:39 p.m.
NER Named-entity recognition batch_69c6e5b9f13c8190a14898f241ec17a4 completed March 27, 2026, 8:16 p.m.
PD Predicate disambiguation batch_69c6e1c313e481908b61a23fc89f9332 completed March 27, 2026, 8 p.m.
Created at: March 27, 2026, 2:42 p.m.