Triple
T7078929
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Russian coastal fortifications at Sveaborg |
E164893
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | naval fortress |
C1579
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: naval fortress Context triple: [Russian coastal fortifications at Sveaborg, instanceOf, naval fortress]
-
A.
sea fort
chosen
A sea fort is a fortified structure built on or near the sea, typically on artificial islands, rocks, or coastal waters, designed to defend harbors, coastlines, or strategic maritime routes.
-
B.
naval arsenal
A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
-
C.
fortified town
A fortified town is a settlement enclosed by defensive structures such as walls, towers, and gates, designed to protect its inhabitants and resources from external threats.
-
D.
military fortification system
A military fortification system is an integrated network of defensive structures, obstacles, and support facilities designed to protect territory, forces, and strategic assets from enemy attack.
-
E.
naval shore establishment
A naval shore establishment is a land-based facility that supports a navy’s operations, administration, training, logistics, and maintenance away from seagoing vessels.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6887cbc6c8190bdfac42d940f4d8a |
completed | March 27, 2026, 1:39 p.m. |
Created at: March 27, 2026, 2:40 p.m.