Triple
T7078450
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Temple of Baalat Gebal |
E164882
|
entity |
| Predicate | excavationMajorPhase |
P7651
|
FINISHED |
| Object | 1920s–1930s |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1920s–1930s | Statement: [Temple of Baalat Gebal, excavationMajorPhase, 1920s–1930s]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: excavationMajorPhase Context triple: [Temple of Baalat Gebal, excavationMajorPhase, 1920s–1930s]
-
A.
excavationResumed
Indicates that a previously halted excavation activity has been started again.
-
B.
excavationType
Indicates the specific method or category of excavation associated with an entity or activity.
-
C.
majorExcavationsBegan
chosen
Indicates that significant archaeological or construction excavation work was initiated at a particular time or for a particular project.
-
D.
excavationStatus
Indicates the current state or phase of an excavation activity, such as whether it is planned, in progress, paused, or completed.
-
E.
majorPhase
Indicates that one phase is a primary or dominant stage within a larger process, lifecycle, or sequence.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6887cbc6c8190bdfac42d940f4d8a |
completed | March 27, 2026, 1:39 p.m. |
| NER | Named-entity recognition | batch_69c6e4ef47d48190b31125d1b57f7bec |
completed | March 27, 2026, 8:13 p.m. |
| PD | Predicate disambiguation | batch_69c6e1bfcb948190a5ada74fb8c054cb |
completed | March 27, 2026, 8 p.m. |
Created at: March 27, 2026, 2:40 p.m.