Triple

T7058257
Position Surface form Disambiguated ID Type / Status
Subject Merrickville Locks E164150 entity
Predicate instanceOf P0 FINISHED
Object Rideau Canal lockstation C14228 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Rideau Canal lockstation
Context triple: [Merrickville Locks, instanceOf, Rideau Canal lockstation]
  • A. Parliament Hill building
    Parliament Hill building: The Parliament Hill building is a grand, historic government complex that houses the federal legislative chambers and offices, symbolizing national democracy and political authority.
  • B. royal stables complex
    A royal stables complex is an organized ensemble of buildings and yards designed to house, train, and maintain horses and related equipment for a royal household’s transportation, ceremonial, and military needs.
  • C. granite bridge
    A granite bridge is a durable, load-bearing structure constructed primarily from granite blocks or slabs, designed to span physical obstacles such as rivers, roads, or valleys.
  • D. Panama Canal infrastructure
    Panama Canal infrastructure encompasses the system of locks, channels, dams, ports, support facilities, and control technologies that enable the transit, management, and maintenance of maritime traffic through the Panama Canal.
  • E. lock and dam structure chosen
    A lock and dam structure is an engineered system on a waterway that combines a gated dam to control water levels with a lock chamber to raise and lower vessels between different elevations for safe and efficient navigation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68861678881909961ddf4d779f750 completed March 27, 2026, 1:38 p.m.
Created at: March 27, 2026, 2:38 p.m.