Triple
T7048560
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Chicago (via Lake Shore Limited) |
E163705
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | train service destination |
C2217
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: train service destination Context triple: [Chicago (via Lake Shore Limited), instanceOf, train service destination]
-
A.
railway line service pattern
A railway line service pattern defines the structured arrangement of train services over a route, including stopping sequences, frequencies, and service types that determine how trains operate along the line.
-
B.
railway route
chosen
A railway route is a defined path or corridor along which trains operate between specified locations, following designated tracks, schedules, and operational rules.
-
C.
train station
A train station is a designated facility where trains regularly stop to pick up and drop off passengers and sometimes freight, typically featuring platforms, ticketing services, and waiting areas.
-
D.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
-
E.
passenger rail service
Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6885f598c8190b6b6495c59d8d962 |
completed | March 27, 2026, 1:38 p.m. |
Created at: March 27, 2026, 2:37 p.m.