Triple

T7039954
Position Surface form Disambiguated ID Type / Status
Subject 大阪城公園駅 E163483 entity
Predicate locatedOn P40 FINISHED
Object 大阪環状線本線 E58281 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 大阪環状線本線 | Statement: [大阪城公園駅, locatedOn, 大阪環状線本線]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: 大阪環状線本線
Context triple: [大阪城公園駅, locatedOn, 大阪環状線本線]
  • A. Osaka Loop Line chosen
    The Osaka Loop Line is a circular railway line in Osaka, Japan, operated by JR West, that connects major urban and suburban districts around the city center.
  • B. 京阪本線
    京阪本線は、大阪と京都を結び京阪電気鉄道の主要幹線として都市間輸送や通勤・通学需要を担う鉄道路線です。
  • C. 長堀鶴見緑地線
    長堀鶴見緑地線は、大阪市中心部と鶴見緑地方面を結ぶ大阪市高速電気軌道(Osaka Metro)の地下鉄路線です。
  • D. Osaka Metro Midosuji Line
    The Osaka Metro Midosuji Line is a major north–south subway line in Osaka, Japan, forming the city’s primary transit backbone and connecting key commercial and transport hubs.
  • E. Osaka Metro Chuo Line
    The Osaka Metro Chuo Line is a major rapid transit line in Osaka, Japan, running east–west through the city and serving key commercial, business, and waterfront areas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6885e7c1c8190be32a8f79ab4e0cf completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6e22426508190ad7a17d14a086a3e completed March 27, 2026, 8:01 p.m.
NED1 Entity disambiguation (via context triple) batch_69c775afabbc8190a6ff263b1a996c9c completed March 28, 2026, 6:31 a.m.
Created at: March 27, 2026, 2:36 p.m.