Triple

T7022334
Position Surface form Disambiguated ID Type / Status
Subject Arizona Department of Transportation E162856 entity
Predicate hasDivision P35 FINISHED
Object Infrastructure Delivery and Operations division
The Infrastructure Delivery and Operations division is the branch of the Arizona Department of Transportation responsible for planning, constructing, and maintaining the state’s transportation infrastructure and ensuring its safe, efficient operation.
E636724 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Infrastructure Delivery and Operations division | Statement: [Arizona Department of Transportation, hasDivision, Infrastructure Delivery and Operations division]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Infrastructure Delivery and Operations division
Context triple: [Arizona Department of Transportation, hasDivision, Infrastructure Delivery and Operations division]
  • A. Infrastructure Design and Construction division
    The Infrastructure Design and Construction division is a unit of San Francisco’s public works department responsible for planning, engineering, and delivering the city’s public infrastructure projects.
  • B. Technology and Construction Division
    The Technology and Construction Division is a specialist court within the DIFC Courts that focuses on resolving complex disputes involving technology, engineering, and construction projects.
  • C. infrastructure and energy division
    The infrastructure and energy division is a specialized unit responsible for formulating, coordinating, and monitoring policies and projects related to infrastructure development and the energy sector.
  • D. Engineering and Construction division
    The Engineering and Construction division is a unit of the Maryland Port Administration responsible for planning, designing, and overseeing port infrastructure projects and facility improvements.
  • E. Machinery, Equipment and Infrastructure Division
    The Machinery, Equipment and Infrastructure Division is a core business unit of Mitsubishi Heavy Industries that focuses on manufacturing industrial machinery, equipment, and large-scale infrastructure systems.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Infrastructure Delivery and Operations division
Triple: [Arizona Department of Transportation, hasDivision, Infrastructure Delivery and Operations division]
Generated description
The Infrastructure Delivery and Operations division is the branch of the Arizona Department of Transportation responsible for planning, constructing, and maintaining the state’s transportation infrastructure and ensuring its safe, efficient operation.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Infrastructure Delivery and Operations division
Target entity description: The Infrastructure Delivery and Operations division is the branch of the Arizona Department of Transportation responsible for planning, constructing, and maintaining the state’s transportation infrastructure and ensuring its safe, efficient operation.
  • A. Infrastructure Design and Construction division
    The Infrastructure Design and Construction division is a unit of San Francisco’s public works department responsible for planning, engineering, and delivering the city’s public infrastructure projects.
  • B. Technology and Construction Division
    The Technology and Construction Division is a specialist court within the DIFC Courts that focuses on resolving complex disputes involving technology, engineering, and construction projects.
  • C. infrastructure and energy division
    The infrastructure and energy division is a specialized unit responsible for formulating, coordinating, and monitoring policies and projects related to infrastructure development and the energy sector.
  • D. Engineering and Construction division
    The Engineering and Construction division is a unit of the Maryland Port Administration responsible for planning, designing, and overseeing port infrastructure projects and facility improvements.
  • E. Machinery, Equipment and Infrastructure Division
    The Machinery, Equipment and Infrastructure Division is a core business unit of Mitsubishi Heavy Industries that focuses on manufacturing industrial machinery, equipment, and large-scale infrastructure systems.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6885b26248190a857541e3d10e299 completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6e1edf3608190b7ba0bfb85710e97 completed March 27, 2026, 8 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7757c87788190b09ced669b5c4d83 completed March 28, 2026, 6:30 a.m.
NEDg Description generation batch_69c7777be0d08190b6be22c72d2da12e completed March 28, 2026, 6:38 a.m.
NED2 Entity disambiguation (via description) batch_69c77851ace48190a2a4899181f3d14a completed March 28, 2026, 6:42 a.m.
Created at: March 27, 2026, 2:35 p.m.