Triple
T7016862
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ministry of Development of North Eastern Region |
E162718
|
entity |
| Predicate | oversees |
P46
|
FINISHED |
| Object |
North East Road Sector Development Scheme
The North East Road Sector Development Scheme is an Indian government initiative focused on improving and expanding road infrastructure to enhance connectivity and economic development in the North Eastern Region.
|
E635210
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: North East Road Sector Development Scheme | Statement: [Ministry of Development of North Eastern Region, oversees, North East Road Sector Development Scheme]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: North East Road Sector Development Scheme Context triple: [Ministry of Development of North Eastern Region, oversees, North East Road Sector Development Scheme]
-
A.
Mirpur Road corridor
The Mirpur Road corridor is a major urban thoroughfare and commercial strip in Dhaka, Bangladesh, lined with markets, offices, and residential areas and serving as a key north–south transport route in the city.
-
B.
N1 Western Bypass
The N1 Western Bypass is a major freeway segment of South Africa’s N1 that skirts the western side of Johannesburg, carrying heavy commuter and long-distance traffic past suburbs such as Roodepoort.
-
C.
Newark-on-Trent bypass
The Newark-on-Trent bypass is a major section of the A46 that diverts through-traffic around the town of Newark-on-Trent to improve traffic flow and reduce congestion.
-
D.
Aden Road corridor
The Aden Road corridor is a transportation and development corridor running through the Bull Run Mountains region of Virginia, serving as a key local route and access point within the surrounding rural and suburban landscape.
-
E.
N13 road
The N13 road is a major national highway in northwestern France that connects key towns in Normandy and serves as an important route between Caen and Cherbourg.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: North East Road Sector Development Scheme Triple: [Ministry of Development of North Eastern Region, oversees, North East Road Sector Development Scheme]
Generated description
The North East Road Sector Development Scheme is an Indian government initiative focused on improving and expanding road infrastructure to enhance connectivity and economic development in the North Eastern Region.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: North East Road Sector Development Scheme Target entity description: The North East Road Sector Development Scheme is an Indian government initiative focused on improving and expanding road infrastructure to enhance connectivity and economic development in the North Eastern Region.
-
A.
Mirpur Road corridor
The Mirpur Road corridor is a major urban thoroughfare and commercial strip in Dhaka, Bangladesh, lined with markets, offices, and residential areas and serving as a key north–south transport route in the city.
-
B.
N1 Western Bypass
The N1 Western Bypass is a major freeway segment of South Africa’s N1 that skirts the western side of Johannesburg, carrying heavy commuter and long-distance traffic past suburbs such as Roodepoort.
-
C.
Newark-on-Trent bypass
The Newark-on-Trent bypass is a major section of the A46 that diverts through-traffic around the town of Newark-on-Trent to improve traffic flow and reduce congestion.
-
D.
Aden Road corridor
The Aden Road corridor is a transportation and development corridor running through the Bull Run Mountains region of Virginia, serving as a key local route and access point within the surrounding rural and suburban landscape.
-
E.
N13 road
The N13 road is a major national highway in northwestern France that connects key towns in Normandy and serves as an important route between Caen and Cherbourg.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6885a127c8190867b059bdccf13ff |
completed | March 27, 2026, 1:38 p.m. |
| NER | Named-entity recognition | batch_69c6e1d629fc81908854390ddf99b1db |
completed | March 27, 2026, 8 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c76a5655d48190a2df556f63add35d |
completed | March 28, 2026, 5:42 a.m. |
| NEDg | Description generation | batch_69c76b9702d4819099f873b37fad309b |
completed | March 28, 2026, 5:48 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69c76c10303c8190a08f1728da6ebcd2 |
completed | March 28, 2026, 5:50 a.m. |
Created at: March 27, 2026, 2:34 p.m.