Triple

T7014264
Position Surface form Disambiguated ID Type / Status
Subject Shimen Reservoir E162660 entity
Predicate instanceOf P0 FINISHED
Object multipurpose reservoir C20500 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multipurpose reservoir
Context triple: [Shimen Reservoir, instanceOf, multipurpose reservoir]
  • A. water reservoir chosen
    A water reservoir is a man-made or natural storage area designed to collect, hold, and regulate water for uses such as drinking supply, irrigation, flood control, and power generation.
  • B. multipurpose dam
    A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
  • C. water reservoir complex
    A water reservoir complex is an integrated system of interconnected reservoirs, infrastructure, and control facilities designed to store, manage, and distribute water for purposes such as supply, irrigation, flood control, and power generation.
  • D. reservoir dam
    A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
  • E. water supply dam
    A water supply dam is a barrier constructed across a watercourse to store and regulate water primarily for human consumption, irrigation, and other municipal or industrial uses.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6885a127c8190867b059bdccf13ff completed March 27, 2026, 1:38 p.m.
Created at: March 27, 2026, 2:34 p.m.