Triple

T7011558
Position Surface form Disambiguated ID Type / Status
Subject Bogor Station E162593 entity
Predicate locatedOn P40 FINISHED
Object Jakarta–Bogor railway
The Jakarta–Bogor railway is a major commuter and intercity rail line in West Java, Indonesia, connecting the capital city Jakarta with the regional city of Bogor.
E636007 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jakarta–Bogor railway | Statement: [Bogor Station, locatedOn, Jakarta–Bogor railway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Jakarta–Bogor railway
Context triple: [Bogor Station, locatedOn, Jakarta–Bogor railway]
  • A. Jakarta–Bandung railway
    The Jakarta–Bandung railway is a major rail corridor in Indonesia that connects the capital city Jakarta with the highland city of Bandung, serving as a key route for passenger and regional transport across West Java.
  • B. Yogyakarta–Solo railway line
    The Yogyakarta–Solo railway line is a key rail corridor in Central Java, Indonesia, connecting the major cultural and economic centers of Yogyakarta and Surakarta (Solo) and serving numerous intermediate towns and regencies.
  • C. Bandung–Cicalengka railway
    The Bandung–Cicalengka railway is a key commuter and regional rail line in West Java, Indonesia, connecting the city of Bandung with the eastern town of Cicalengka as part of the broader Bandung metropolitan rail network.
  • D. North Java railway line
    The North Java railway line is a major rail corridor running along the northern coast of Java, Indonesia, connecting key cities and serving as an important route for both passenger and freight transport.
  • E. Jakarta LRT
    Jakarta LRT is a light rail transit system serving parts of the Greater Jakarta metropolitan area in Indonesia, designed to alleviate traffic congestion and improve urban mobility.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Jakarta–Bogor railway
Triple: [Bogor Station, locatedOn, Jakarta–Bogor railway]
Generated description
The Jakarta–Bogor railway is a major commuter and intercity rail line in West Java, Indonesia, connecting the capital city Jakarta with the regional city of Bogor.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Jakarta–Bogor railway
Target entity description: The Jakarta–Bogor railway is a major commuter and intercity rail line in West Java, Indonesia, connecting the capital city Jakarta with the regional city of Bogor.
  • A. Jakarta–Bandung railway
    The Jakarta–Bandung railway is a major rail corridor in Indonesia that connects the capital city Jakarta with the highland city of Bandung, serving as a key route for passenger and regional transport across West Java.
  • B. Yogyakarta–Solo railway line
    The Yogyakarta–Solo railway line is a key rail corridor in Central Java, Indonesia, connecting the major cultural and economic centers of Yogyakarta and Surakarta (Solo) and serving numerous intermediate towns and regencies.
  • C. Bandung–Cicalengka railway
    The Bandung–Cicalengka railway is a key commuter and regional rail line in West Java, Indonesia, connecting the city of Bandung with the eastern town of Cicalengka as part of the broader Bandung metropolitan rail network.
  • D. North Java railway line
    The North Java railway line is a major rail corridor running along the northern coast of Java, Indonesia, connecting key cities and serving as an important route for both passenger and freight transport.
  • E. Jakarta LRT
    Jakarta LRT is a light rail transit system serving parts of the Greater Jakarta metropolitan area in Indonesia, designed to alleviate traffic congestion and improve urban mobility.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6885a127c8190867b059bdccf13ff completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6dc5729448190af66dbd6f3e8936e completed March 27, 2026, 7:36 p.m.
NED1 Entity disambiguation (via context triple) batch_69c775612fe88190822f297f2bec6cd1 completed March 28, 2026, 6:29 a.m.
NEDg Description generation batch_69c777902cbc8190b24ee5e441c5607e completed March 28, 2026, 6:39 a.m.
NED2 Entity disambiguation (via description) batch_69c77807d33c8190bb3e236829f06071 completed March 28, 2026, 6:41 a.m.
Created at: March 27, 2026, 2:34 p.m.