Triple

T7011519
Position Surface form Disambiguated ID Type / Status
Subject Citarum River E162592 entity
Predicate hasDam P8736 FINISHED
Object Cirata Dam E160655 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cirata Dam | Statement: [Citarum River, hasDam, Cirata Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cirata Dam
Context triple: [Citarum River, hasDam, Cirata Dam]
  • A. Selorejo Dam
    Selorejo Dam is a multipurpose reservoir in East Java, Indonesia, known for irrigation, hydropower generation, flood control, and tourism within the Brantas River basin.
  • B. Cirata Reservoir chosen
    Cirata Reservoir is a large artificial lake and hydroelectric power reservoir in West Java, Indonesia, used for electricity generation, irrigation, and fisheries.
  • C. Wayatinah Dam
    Wayatinah Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s major power generation scheme.
  • D. Wlingi Dam
    Wlingi Dam is a hydroelectric and irrigation dam located on the Brantas River in East Java, Indonesia.
  • E. Jatiluhur Reservoir
    Jatiluhur Reservoir is a large multipurpose dam and artificial lake in West Java, Indonesia, used for hydroelectric power, irrigation, flood control, and water supply.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6885a127c8190867b059bdccf13ff completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6dc5729448190af66dbd6f3e8936e completed March 27, 2026, 7:36 p.m.
NED1 Entity disambiguation (via context triple) batch_69c775612fe88190822f297f2bec6cd1 completed March 28, 2026, 6:29 a.m.
Created at: March 27, 2026, 2:34 p.m.