Triple

T7010535
Position Surface form Disambiguated ID Type / Status
Subject Cockatoo Island E162568 entity
Predicate instanceOf P0 FINISHED
Object former shipyard C13843 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: former shipyard
Context triple: [Cockatoo Island, instanceOf, former shipyard]
  • A. shipbuilding facility
    A shipbuilding facility is an industrial site equipped with specialized infrastructure, tools, and workforce for designing, constructing, and outfitting ships and other large marine vessels.
  • B. shipbuilding firm
    A shipbuilding firm is a company that designs, constructs, and sometimes repairs ships and other marine vessels for commercial, military, or private use.
  • C. historic shipyard chosen
    A historic shipyard is a preserved maritime industrial site where ships were once designed, built, repaired, and launched, often retaining original structures, tools, and waterfront infrastructure that reflect its historical significance.
  • D. shipbuilder
    A shipbuilder is a professional or company that designs, constructs, and repairs ships and other marine vessels, coordinating engineering, materials, and labor to ensure seaworthy and efficient watercraft.
  • E. former naval base
    A former naval base is a decommissioned military maritime facility that once supported naval operations but has since been repurposed, abandoned, or converted to civilian use.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6885928148190ae31909fbb5e9849 completed March 27, 2026, 1:38 p.m.
Created at: March 27, 2026, 2:34 p.m.