Triple

T7008685
Position Surface form Disambiguated ID Type / Status
Subject Frankston line E162523 entity
Predicate rollingStock P1305 FINISHED
Object Siemens Nexas E623209 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Siemens Nexas | Statement: [Frankston line, rollingStock, Siemens Nexas]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Siemens Nexas
Context triple: [Frankston line, rollingStock, Siemens Nexas]
  • A. Siemens Nexas chosen
    Siemens Nexas is a class of electric multiple unit trains used for suburban passenger services on Melbourne’s metropolitan rail network.
  • B. Siemens Avanto
    Siemens Avanto is a family of light rail and tram-train vehicles developed by Siemens for urban and regional public transport systems.
  • C. Siemens Inspiro
    Siemens Inspiro is a modern, modular metro train platform developed by Siemens for urban rapid transit systems worldwide.
  • D. Siemens SD100
    The Siemens SD100 is a light rail vehicle model built by Siemens for use on urban trolley and light rail systems such as the San Diego Trolley.
  • E. Siemens U2
    Siemens U2 is a type of light rail vehicle widely used in North American transit systems, including the San Diego Trolley, known for its articulated design and high-floor configuration.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6885928148190ae31909fbb5e9849 completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6dc36e3fc8190957445132a9ffb5f completed March 27, 2026, 7:36 p.m.
NED1 Entity disambiguation (via context triple) batch_69c76a47aa6481908ac0039b2b728edb completed March 28, 2026, 5:42 a.m.
Created at: March 27, 2026, 2:33 p.m.