Triple
T7002149
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gotthard route |
E162360
|
entity |
| Predicate | railwayCorridorIncludes |
P57554
|
FINISHED |
| Object | Gotthard railway line |
E162360
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gotthard railway line | Statement: [Gotthard route, railwayCorridorIncludes, Gotthard railway line]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Gotthard railway line Context triple: [Gotthard route, railwayCorridorIncludes, Gotthard railway line]
-
A.
Lötschberg railway line
The Lötschberg railway line is a major Swiss Alpine rail route operated by BLS that connects the Bernese Oberland with the Valais through long tunnels and dramatic mountain scenery.
-
B.
Simplon railway line
The Simplon railway line is a major trans-Alpine rail route connecting Switzerland and Italy through the Simplon Tunnel, serving as an important international passenger and freight corridor.
-
C.
Gotthard route
chosen
The Gotthard route is a major north–south trans-Alpine transport corridor in Switzerland, linking central Europe with Italy via road and rail tunnels through the Gotthard massif.
-
D.
Bern–Lucerne railway line
The Bern–Lucerne railway line is a major Swiss rail route connecting the capital city of Bern with the central Swiss city of Lucerne, serving as an important corridor for both regional and intercity passenger traffic.
-
E.
Davos–Filisur railway line
The Davos–Filisur railway line is a scenic metre-gauge mountain railway in the Swiss canton of Graubünden, known for its dramatic alpine landscapes, tunnels, and viaducts operated by the Rhaetian Railway.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: railwayCorridorIncludes Context triple: [Gotthard route, railwayCorridorIncludes, Gotthard railway line]
-
A.
partOfRailwayCorridor
chosen
Indicates that one entity is a segment, component, or area belonging to or contained within a specific railway corridor.
-
B.
railwayLine
Indicates that there is a railway line connection or route associated with or passing through the referenced entity.
-
C.
hasRailRoute
Indicates that there exists a rail-based transportation route or connection between the related entities.
-
D.
usesRailInfrastructureOf
Indicates that one entity operates on, accesses, or otherwise makes use of the rail infrastructure owned or managed by another entity.
-
E.
hasRailwayInfrastructureType
Indicates that an entity possesses or is associated with a specific type or category of railway infrastructure.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68857ffc08190857dc62cd5253777 |
completed | March 27, 2026, 1:38 p.m. |
| NER | Named-entity recognition | batch_69c6dc1115c48190a9363473ae21b6c1 |
completed | March 27, 2026, 7:35 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c79436bb708190a67038a717dfa842 |
completed | March 28, 2026, 8:41 a.m. |
| PD | Predicate disambiguation | batch_69c6d7c67c94819084fdcf0398606027 |
completed | March 27, 2026, 7:17 p.m. |
Created at: March 27, 2026, 2:33 p.m.