Triple

T6996110
Position Surface form Disambiguated ID Type / Status
Subject British Rail Class 387 E162218 entity
Predicate family P566 FINISHED
Object Electrostar E553230 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Electrostar | Statement: [British Rail Class 387, family, Electrostar]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Electrostar
Context triple: [British Rail Class 387, family, Electrostar]
  • A. Electrostar chosen
    Electrostar is a widely used family of British electric multiple-unit commuter trains built by Bombardier for suburban and regional services.
  • B. Siemens Vectron
    Siemens Vectron is a modular family of electric and diesel-electric locomotives designed for versatile passenger and freight operations across European rail networks.
  • C. Comeng EMU
    The Comeng EMU is a long-serving class of electric multiple unit trains used on Melbourne's suburban rail network.
  • D. Aventra
    Aventra is a family of modern electric multiple-unit trains designed and built by Bombardier Transportation (now Alstom) for use on the UK rail network.
  • E. Bombardier TRAXX
    Bombardier TRAXX is a family of modular electric and diesel-electric locomotives widely used for passenger and freight services across Europe.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68857ffc08190857dc62cd5253777 completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6dbedafa48190af0d2b47e3a1e17e completed March 27, 2026, 7:35 p.m.
NED1 Entity disambiguation (via context triple) batch_69c76a1fa11481908450978acc1e0913 completed March 28, 2026, 5:41 a.m.
Created at: March 27, 2026, 2:32 p.m.