Triple

T6990371
Position Surface form Disambiguated ID Type / Status
Subject Grand Inga Dam Project E162068 entity
Predicate relatedProject P2830 FINISHED
Object Inga II Dam E621611 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Inga II Dam | Statement: [Grand Inga Dam Project, relatedProject, Inga II Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Inga II Dam
Context triple: [Grand Inga Dam Project, relatedProject, Inga II Dam]
  • A. Inga II Dam chosen
    Inga II Dam is a major hydroelectric power facility on the Congo River in the Democratic Republic of the Congo, forming part of the Inga Falls complex and supplying electricity to the region and beyond.
  • B. Inga III Dam
    Inga III Dam is a planned large-scale hydroelectric dam on the Congo River in the Democratic Republic of the Congo, envisioned as an early phase of the massive Inga hydropower development intended to supply electricity across Africa.
  • C. Itumbiara Dam
    Itumbiara Dam is a large hydroelectric dam in Brazil known for generating significant electricity and forming one of the country’s major artificial reservoirs.
  • D. Bariri Dam
    Bariri Dam is a hydroelectric and river regulation structure located on Brazil’s Tietê River, contributing to regional power generation and water management.
  • E. Itezhi-Tezhi Dam
    Itezhi-Tezhi Dam is a major hydroelectric and water-regulation dam in Zambia that helps control flows and generate power along the Kafue River system, a key tributary of the Zambezi.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68856d7808190ab33ee914640281b completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6dbc08758819083d36a1fc0463b27 completed March 27, 2026, 7:34 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7943400d08190ba5774e5d45e7e27 completed March 28, 2026, 8:41 a.m.
Created at: March 27, 2026, 2:32 p.m.