Triple

T696310
Position Surface form Disambiguated ID Type / Status
Subject ASRAAM E13900 entity
Predicate upgradePath P17584 FINISHED
Object Block upgrades with improved seeker and electronics LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Block upgrades with improved seeker and electronics | Statement: [ASRAAM, upgradePath, Block upgrades with improved seeker and electronics]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: upgradePath
Context triple: [ASRAAM, upgradePath, Block upgrades with improved seeker and electronics]
  • A. upgradeProgram
    Indicates that one entity improves, enhances, or replaces another entity’s program with a more advanced or updated version.
  • B. upgradeFocus
    Indicates a shift of attention or priority from a lower level or version to a higher, improved, or more advanced one.
  • C. upgradeEligibility
    Indicates whether an entity qualifies to move from its current version, level, or plan to a higher or more advanced one under defined criteria.
  • D. upgradePhase
    Indicates the stage or step within a process where an entity is being upgraded or transitioned to a more advanced version or state.
  • E. plannedUpgrade
    Indicates that an entity has a scheduled or intended improvement or enhancement to be carried out in the future.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493406c408190957eeec9048a8fb6 completed March 1, 2026, 7:28 p.m.
NER Named-entity recognition batch_69a4a0c5f51c8190acc4915099e4b384 completed March 1, 2026, 8:25 p.m.
PD Predicate disambiguation batch_69a49d23e0a08190b08be9d1eff2a1bb completed March 1, 2026, 8:10 p.m.
PDg Predicate description generation batch_69a49df19c9481909cc9bc33ed7f011b completed March 1, 2026, 8:13 p.m.
Created at: March 1, 2026, 7:36 p.m.