Triple
T6956539
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 1993 Latur earthquake |
E161255
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Earthquake |
C8058
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Earthquake Context triple: [1993 Latur earthquake, instanceOf, Earthquake]
-
A.
earthquake sequence
An earthquake sequence is a series of temporally and spatially related earthquakes, including mainshocks, foreshocks, and aftershocks, that occur as a fault system adjusts to stress changes in the Earth's crust.
-
B.
undersea earthquake
An undersea earthquake is a sudden release of energy along faults beneath the ocean floor, causing seismic shaking that can displace large volumes of water and potentially generate tsunamis.
-
C.
intraplate earthquake
chosen
An intraplate earthquake is a seismic event that occurs within the interior of a tectonic plate, far from plate boundaries, typically caused by the reactivation of ancient faults or stresses transmitted through the plate.
-
D.
earthquake intensity scale
An earthquake intensity scale is a system that categorizes and describes the observed effects and damage of an earthquake at specific locations on the Earth's surface.
-
E.
earthquake monitoring center
An earthquake monitoring center is a facility that continuously collects, analyzes, and disseminates seismic data to detect earthquakes, assess their impact, and support early warning and emergency response efforts.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68852a9a0819097797e31d492e273 |
completed | March 27, 2026, 1:38 p.m. |
Created at: March 27, 2026, 2:29 p.m.