Triple
T6951048
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Barry Docks |
E160924
|
entity |
| Predicate | hasPart |
P35
|
FINISHED |
| Object |
No. 5 Dock
No. 5 Dock is one of the principal dock basins within Barry Docks in South Wales, historically used for handling maritime trade and cargo shipping.
|
E634150
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: No. 5 Dock | Statement: [Barry Docks, hasPart, No. 5 Dock]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: No. 5 Dock Context triple: [Barry Docks, hasPart, No. 5 Dock]
-
A.
No. 2 Dock
No. 2 Dock is one of the principal dock basins within Barry Docks in South Wales, historically used for handling coal exports and other maritime trade.
-
B.
No. 1 Dock
No. 1 Dock is a principal basin within the Barry Docks complex in South Wales, historically used for handling maritime trade and shipping.
-
C.
Dry Dock No. 4
Dry Dock No. 4 is a historic early-20th-century naval dry dock at the Brooklyn Navy Yard in New York City, notable for its role in the construction and repair of U.S. Navy vessels.
-
D.
Dry Dock No. 2
Dry Dock No. 2 is a historic early-19th-century stone dry dock at the Brooklyn Navy Yard, notable for its role in U.S. naval shipbuilding and maritime engineering.
-
E.
Dry Dock No. 3
Dry Dock No. 3 is a historic 19th-century stone dry dock at the Brooklyn Navy Yard, notable for its role in U.S. naval shipbuilding and repair.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: No. 5 Dock Triple: [Barry Docks, hasPart, No. 5 Dock]
Generated description
No. 5 Dock is one of the principal dock basins within Barry Docks in South Wales, historically used for handling maritime trade and cargo shipping.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: No. 5 Dock Target entity description: No. 5 Dock is one of the principal dock basins within Barry Docks in South Wales, historically used for handling maritime trade and cargo shipping.
-
A.
No. 2 Dock
No. 2 Dock is one of the principal dock basins within Barry Docks in South Wales, historically used for handling coal exports and other maritime trade.
-
B.
No. 1 Dock
No. 1 Dock is a principal basin within the Barry Docks complex in South Wales, historically used for handling maritime trade and shipping.
-
C.
Dry Dock No. 4
Dry Dock No. 4 is a historic early-20th-century naval dry dock at the Brooklyn Navy Yard in New York City, notable for its role in the construction and repair of U.S. Navy vessels.
-
D.
Dry Dock No. 2
Dry Dock No. 2 is a historic early-19th-century stone dry dock at the Brooklyn Navy Yard, notable for its role in U.S. naval shipbuilding and maritime engineering.
-
E.
Dry Dock No. 3
Dry Dock No. 3 is a historic 19th-century stone dry dock at the Brooklyn Navy Yard, notable for its role in U.S. naval shipbuilding and repair.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68850419081909fb426b8f5a304c7 |
completed | March 27, 2026, 1:38 p.m. |
| NER | Named-entity recognition | batch_69c6dab041748190851c5221b6b740e1 |
completed | March 27, 2026, 7:29 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c769fd908c81908d92ff4cd79b76c0 |
completed | March 28, 2026, 5:41 a.m. |
| NEDg | Description generation | batch_69c76a75496c8190a3268361ec142946 |
completed | March 28, 2026, 5:43 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69c76b05eb8c81909433fb4a26044a72 |
completed | March 28, 2026, 5:45 a.m. |
Created at: March 27, 2026, 2:29 p.m.