Triple
T6949576
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | deconstruction (philosophy) |
E160885
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | critical method |
C21394
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: critical method Context triple: [deconstruction (philosophy), instanceOf, critical method]
-
A.
critical movement
A critical movement is a coordinated social, political, or artistic effort that challenges and seeks to transform dominant structures, norms, or power relations through critique and collective action.
-
B.
criticalReceptionAspect
A criticalReceptionAspect represents a specific dimension or criterion (such as style, originality, or impact) by which a work is evaluated and discussed in critical reviews.
-
C.
crisis
A crisis is a critical turning point or period of intense difficulty and instability that demands urgent decision-making and action to prevent severe negative consequences.
-
D.
climactic mission
A climactic mission is the decisive, high-stakes undertaking at a story’s peak where characters confront their greatest challenges and the central conflict reaches its ultimate resolution.
-
E.
cascade
A cascade is a sequence of events, processes, or elements in which each step triggers or influences the next, often amplifying effects as they progress.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68850419081909fb426b8f5a304c7 |
completed | March 27, 2026, 1:38 p.m. |
Created at: March 27, 2026, 2:29 p.m.