Triple

T6940334
Position Surface form Disambiguated ID Type / Status
Subject Bekasi Station E160656 entity
Predicate locatedOnRailwayCorridor P57554 FINISHED
Object Jakarta–Bandung–Cirebon corridor
The Jakarta–Bandung–Cirebon corridor is a major rail and transport axis in West Java, Indonesia, linking the capital Jakarta with the key cities of Bandung and Cirebon and serving as an important route for passenger and freight movement.
E452723 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jakarta–Bandung–Cirebon corridor | Statement: [Bekasi Station, locatedOnRailwayCorridor, Jakarta–Bandung–Cirebon corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Jakarta–Bandung–Cirebon corridor
Context triple: [Bekasi Station, locatedOnRailwayCorridor, Jakarta–Bandung–Cirebon corridor]
  • A. Jakarta–Merak corridor
    The Jakarta–Merak corridor is a major transportation axis in western Java, Indonesia, linking the capital region around Jakarta with the key ferry port of Merak that connects Java to Sumatra.
  • B. Jakarta–Bandung railway
    The Jakarta–Bandung railway is a major rail corridor in Indonesia that connects the capital city Jakarta with the highland city of Bandung, serving as a key route for passenger and regional transport across West Java.
  • C. Yogyakarta–Solo railway line
    The Yogyakarta–Solo railway line is a key rail corridor in Central Java, Indonesia, connecting the major cultural and economic centers of Yogyakarta and Surakarta (Solo) and serving numerous intermediate towns and regencies.
  • D. Bandung–Cicalengka railway
    The Bandung–Cicalengka railway is a key commuter and regional rail line in West Java, Indonesia, connecting the city of Bandung with the eastern town of Cicalengka as part of the broader Bandung metropolitan rail network.
  • E. Bandung–Garut railway
    The Bandung–Garut railway is a rail line in West Java, Indonesia, that historically connected the city of Bandung with the town of Garut, serving as an important regional transport route.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Jakarta–Bandung–Cirebon corridor
Triple: [Bekasi Station, locatedOnRailwayCorridor, Jakarta–Bandung–Cirebon corridor]
Generated description
The Jakarta–Bandung–Cirebon corridor is a major rail and transport axis in West Java, Indonesia, linking the capital Jakarta with the key cities of Bandung and Cirebon and serving as an important route for passenger and freight movement.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Jakarta–Bandung–Cirebon corridor
Target entity description: The Jakarta–Bandung–Cirebon corridor is a major rail and transport axis in West Java, Indonesia, linking the capital Jakarta with the key cities of Bandung and Cirebon and serving as an important route for passenger and freight movement.
  • A. Jakarta–Merak corridor
    The Jakarta–Merak corridor is a major transportation axis in western Java, Indonesia, linking the capital region around Jakarta with the key ferry port of Merak that connects Java to Sumatra.
  • B. Jakarta–Bandung railway chosen
    The Jakarta–Bandung railway is a major rail corridor in Indonesia that connects the capital city Jakarta with the highland city of Bandung, serving as a key route for passenger and regional transport across West Java.
  • C. Yogyakarta–Solo railway line
    The Yogyakarta–Solo railway line is a key rail corridor in Central Java, Indonesia, connecting the major cultural and economic centers of Yogyakarta and Surakarta (Solo) and serving numerous intermediate towns and regencies.
  • D. Bandung–Cicalengka railway
    The Bandung–Cicalengka railway is a key commuter and regional rail line in West Java, Indonesia, connecting the city of Bandung with the eastern town of Cicalengka as part of the broader Bandung metropolitan rail network.
  • E. Bandung–Garut railway
    The Bandung–Garut railway is a rail line in West Java, Indonesia, that historically connected the city of Bandung with the town of Garut, serving as an important regional transport route.
  • F. None of above.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6884f3db4819080ad65da69386206 completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6da641ce08190a133c9ba4977755d completed March 27, 2026, 7:28 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7515880948190970cadd7adeda435 completed March 28, 2026, 3:56 a.m.
NEDg Description generation batch_69c7524e3ef48190a78601ca290f133d completed March 28, 2026, 4 a.m.
NED2 Entity disambiguation (via description) batch_69c752dca6e08190a087898d99c015ac completed March 28, 2026, 4:02 a.m.
Created at: March 27, 2026, 2:28 p.m.