Triple

T6940270
Position Surface form Disambiguated ID Type / Status
Subject Cirata Hydroelectric Power Plant E160655 entity
Predicate locatedOn P40 FINISHED
Object Cirata Reservoir E160655 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cirata Reservoir | Statement: [Cirata Hydroelectric Power Plant, locatedOn, Cirata Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cirata Reservoir
Context triple: [Cirata Hydroelectric Power Plant, locatedOn, Cirata Reservoir]
  • A. Cirata Reservoir chosen
    Cirata Reservoir is a large artificial lake and hydroelectric power reservoir in West Java, Indonesia, used for electricity generation, irrigation, and fisheries.
  • B. Jatiluhur Reservoir
    Jatiluhur Reservoir is a large multipurpose dam and artificial lake in West Java, Indonesia, used for hydroelectric power, irrigation, flood control, and water supply.
  • C. Selorejo Dam
    Selorejo Dam is a multipurpose reservoir in East Java, Indonesia, known for irrigation, hydropower generation, flood control, and tourism within the Brantas River basin.
  • D. Kertajaya Reservoir
    Kertajaya Reservoir is a water storage and management facility located in West Bandung Regency, West Java, Indonesia.
  • E. Sengguruh Dam
    Sengguruh Dam is a hydroelectric and flood-control dam located on the Brantas River in East Java, Indonesia.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6884f3db4819080ad65da69386206 completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6da641ce08190a133c9ba4977755d completed March 27, 2026, 7:28 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7515880948190970cadd7adeda435 completed March 28, 2026, 3:56 a.m.
Created at: March 27, 2026, 2:28 p.m.