Triple
T6940258
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cirata Reservoir |
E160655
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | hydroelectric power reservoir |
C20500
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: hydroelectric power reservoir Context triple: [Cirata Reservoir, instanceOf, hydroelectric power reservoir]
-
A.
hydroelectric dam
A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
-
B.
reservoir dam
A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
-
C.
hydroelectric power complex
A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
-
D.
water reservoir
chosen
A water reservoir is a man-made or natural storage area designed to collect, hold, and regulate water for uses such as drinking supply, irrigation, flood control, and power generation.
-
E.
run-of-the-river hydroelectric power plant
A run-of-the-river hydroelectric power plant is a facility that generates electricity by using the natural flow and elevation drop of a river with minimal water storage, diverting part of the river through turbines before returning it downstream.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6884f3db4819080ad65da69386206 |
completed | March 27, 2026, 1:38 p.m. |
Created at: March 27, 2026, 2:28 p.m.