Triple
T6932714
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Quetta–Kandahar route |
E160474
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | road transport route |
C1347
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: road transport route Context triple: [Quetta–Kandahar route, instanceOf, road transport route]
-
A.
transportation route
A transportation route is a defined path or corridor used to move people or goods between locations via one or more modes of transport.
-
B.
road transportation corridor
chosen
A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
-
C.
road network
A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
-
D.
road
A road is a prepared surface or pathway designed for the movement of vehicles, pedestrians, or animals between different locations.
-
E.
road infrastructure
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6884e15208190b9e91487eaafcf85 |
completed | March 27, 2026, 1:38 p.m. |
Created at: March 27, 2026, 2:27 p.m.