Triple

T6923649
Position Surface form Disambiguated ID Type / Status
Subject Campbell County, Tennessee E160248 entity
Predicate hasMajorHighway P385 FINISHED
Object U.S. Route 27 NE NERFINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 27 | Statement: [Campbell County, Tennessee, hasMajorHighway, U.S. Route 27]

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6884d350081908d8a970e4d40ad78 completed March 27, 2026, 1:38 p.m.
NER Named-entity recognition batch_69c6d9fea8d08190b6099a24fbac7de5 completed March 27, 2026, 7:26 p.m.
Created at: March 27, 2026, 2:26 p.m.