Triple
T6914987
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Washington/Wells station |
E160027
|
entity |
| Predicate | servedByLine |
P1293
|
FINISHED |
| Object | Purple Line Express |
E171075
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Purple Line Express | Statement: [Washington/Wells station, servedByLine, Purple Line Express]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Purple Line Express Context triple: [Washington/Wells station, servedByLine, Purple Line Express]
-
A.
Purple Line Express
chosen
Purple Line Express is a rush-hour rapid transit service of the Chicago Transit Authority that operates as a faster, limited-stop variant of the Purple Line.
-
B.
Blue Line
The Blue Line is one of the color-coded rapid transit routes in the Washington Metro system, running through key parts of Washington, D.C. and its Virginia suburbs.
-
C.
Blue Line
The Blue Line is a light rail route in the Dallas Area Rapid Transit (DART) system serving key neighborhoods and suburbs in the Dallas–Fort Worth metroplex.
-
D.
Blue Line
The Blue Line is one of the primary routes of the MetroLink light rail system serving the St. Louis metropolitan area.
-
E.
Blue Line
The Blue Line is a planned rapid transit corridor of Bengaluru’s Namma Metro network intended to expand connectivity across additional parts of the city.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c6883ab1008190a07129ff06f625d9 |
completed | March 27, 2026, 1:38 p.m. |
| NER | Named-entity recognition | batch_69c6d9dda4108190a79a7841b0658a4d |
completed | March 27, 2026, 7:26 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c769f6340c8190adab3e28cfe67e4a |
completed | March 28, 2026, 5:41 a.m. |
Created at: March 27, 2026, 2:26 p.m.