Triple

T6889462
Position Surface form Disambiguated ID Type / Status
Subject The Abyss E159007 entity
Predicate filmingLocation P40 FINISHED
Object Cherokee Nuclear Power Plant, South Carolina
Cherokee Nuclear Power Plant in South Carolina is an unfinished nuclear facility best known for serving as the primary underwater filming location for James Cameron’s 1989 science fiction film "The Abyss."
E625762 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cherokee Nuclear Power Plant, South Carolina | Statement: [The Abyss, filmingLocation, Cherokee Nuclear Power Plant, South Carolina]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cherokee Nuclear Power Plant, South Carolina
Context triple: [The Abyss, filmingLocation, Cherokee Nuclear Power Plant, South Carolina]
  • A. Hope Creek Nuclear Generating Station
    Hope Creek Nuclear Generating Station is a single-unit boiling water nuclear power plant located in Lower Alloways Creek Township, New Jersey, that generates electricity for the regional grid.
  • B. Darlington Nuclear Generating Station
    Darlington Nuclear Generating Station is a major Canadian nuclear power plant in Ontario that produces electricity using CANDU reactors operated by Ontario Power Generation.
  • C. Calvert Cliffs Nuclear Power Plant
    Calvert Cliffs Nuclear Power Plant is a two-unit pressurized water nuclear power station on the western shore of the Chesapeake Bay that generates electricity for the Mid-Atlantic region.
  • D. Salem Nuclear Power Plant
    Salem Nuclear Power Plant is a commercial nuclear power station in Lower Alloways Creek Township, New Jersey, that generates electricity using pressurized water reactors along the Delaware River.
  • E. Springfield Nuclear Power Plant
    The Springfield Nuclear Power Plant is the accident-prone workplace of Homer Simpson and a central setting in the animated television series "The Simpsons," symbolizing corporate greed, environmental hazards, and satirical takes on nuclear energy.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Cherokee Nuclear Power Plant, South Carolina
Triple: [The Abyss, filmingLocation, Cherokee Nuclear Power Plant, South Carolina]
Generated description
Cherokee Nuclear Power Plant in South Carolina is an unfinished nuclear facility best known for serving as the primary underwater filming location for James Cameron’s 1989 science fiction film "The Abyss."
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Cherokee Nuclear Power Plant, South Carolina
Target entity description: Cherokee Nuclear Power Plant in South Carolina is an unfinished nuclear facility best known for serving as the primary underwater filming location for James Cameron’s 1989 science fiction film "The Abyss."
  • A. Hope Creek Nuclear Generating Station
    Hope Creek Nuclear Generating Station is a single-unit boiling water nuclear power plant located in Lower Alloways Creek Township, New Jersey, that generates electricity for the regional grid.
  • B. Darlington Nuclear Generating Station
    Darlington Nuclear Generating Station is a major Canadian nuclear power plant in Ontario that produces electricity using CANDU reactors operated by Ontario Power Generation.
  • C. Calvert Cliffs Nuclear Power Plant
    Calvert Cliffs Nuclear Power Plant is a two-unit pressurized water nuclear power station on the western shore of the Chesapeake Bay that generates electricity for the Mid-Atlantic region.
  • D. Salem Nuclear Power Plant
    Salem Nuclear Power Plant is a commercial nuclear power station in Lower Alloways Creek Township, New Jersey, that generates electricity using pressurized water reactors along the Delaware River.
  • E. Springfield Nuclear Power Plant
    The Springfield Nuclear Power Plant is the accident-prone workplace of Homer Simpson and a central setting in the animated television series "The Simpsons," symbolizing corporate greed, environmental hazards, and satirical takes on nuclear energy.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6883568c8819081db6407e892cccc completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6d9117c84819093dad7b765337b63 completed March 27, 2026, 7:22 p.m.
NED1 Entity disambiguation (via context triple) batch_69c742e71bcc81908231a861be47b7db completed March 28, 2026, 2:54 a.m.
NEDg Description generation batch_69c744036378819083a3be5c50b189b2 completed March 28, 2026, 2:59 a.m.
NED2 Entity disambiguation (via description) batch_69c744eb1cf88190aaf90198d04d4500 completed March 28, 2026, 3:03 a.m.
Created at: March 27, 2026, 2:23 p.m.