Triple
T6880824
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Raleigh Bicycle Company |
E158791
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bicycle manufacturer |
C21753
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bicycle manufacturer Context triple: [Raleigh Bicycle Company, instanceOf, bicycle manufacturer]
-
A.
bicycle museum
A bicycle museum is a curated institution that collects, preserves, and exhibits bicycles and related artifacts to showcase the history, technology, and cultural impact of cycling.
-
B.
carriage manufacturer
A carriage manufacturer is a business or craftsman that designs, builds, and assembles horse-drawn vehicles for transportation or specialized use.
-
C.
cycle network
A cycle network is a graph structure in which nodes are connected in a closed loop so that each node is part of at least one simple cycle, enabling circular paths for flow, communication, or dependencies.
-
D.
cycling organization
A cycling organization is a coordinated group or institution that promotes, supports, and manages cycling-related activities, advocacy, events, and resources for riders and communities.
-
E.
touring bicycle organization
A touring bicycle organization is a group that plans, coordinates, and supports long-distance cycling trips, events, and resources for touring cyclists.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c688342f6c8190ad7eea6ba262db99 |
completed | March 27, 2026, 1:37 p.m. |
Created at: March 27, 2026, 2:23 p.m.