Triple

T6873384
Position Surface form Disambiguated ID Type / Status
Subject Skye Bridge E158607 entity
Predicate designedBy P184 FINISHED
Object Halcrow Group E458965 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Halcrow Group | Statement: [Skye Bridge, designedBy, Halcrow Group]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Halcrow Group
Context triple: [Skye Bridge, designedBy, Halcrow Group]
  • A. Halcrow Group chosen
    Halcrow Group was a British engineering consultancy firm known for its work on major infrastructure and transportation projects worldwide.
  • B. Mott MacDonald
    Mott MacDonald is a global engineering, management, and development consultancy known for its work on major infrastructure projects worldwide.
  • C. John Holland Group
    John Holland Group is a major Australian engineering, construction, and infrastructure company involved in large-scale transport and civil projects.
  • D. Sir Robert McAlpine Ltd
    Sir Robert McAlpine Ltd is a major UK-based construction and civil engineering company known for delivering large-scale infrastructure and landmark building projects.
  • E. Arup Associates
    Arup Associates is a multidisciplinary architectural and engineering firm known for designing innovative, high-performance buildings and cultural venues.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68832af1481908ce356e133ebaebe completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6d8c73ea08190b6bb1463e7ead47b completed March 27, 2026, 7:21 p.m.
NED1 Entity disambiguation (via context triple) batch_69c742af0df88190bb23b7495c279e08 completed March 28, 2026, 2:53 a.m.
Created at: March 27, 2026, 2:22 p.m.