Triple
T6871700
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Baspa River |
E158561
|
entity |
| Predicate | hasHydroelectricProject |
P15311
|
FINISHED |
| Object |
Baspa II Hydroelectric Project
Baspa II Hydroelectric Project is a run-of-the-river hydroelectric power plant in Himachal Pradesh, India, that harnesses the Baspa River to generate electricity.
|
E625448
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Baspa II Hydroelectric Project | Statement: [Baspa River, hasHydroelectricProject, Baspa II Hydroelectric Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Baspa II Hydroelectric Project Context triple: [Baspa River, hasHydroelectricProject, Baspa II Hydroelectric Project]
-
A.
Karot Hydropower Project
The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
-
B.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
C.
Punatsangchhu-I Hydroelectric Project
Punatsangchhu-I Hydroelectric Project is a major run-of-the-river hydropower plant under construction in Bhutan, developed with Indian assistance to generate electricity for domestic use and export.
-
D.
Uri Hydroelectric Project
The Uri Hydroelectric Project is a major run-of-the-river power generation scheme on the Jhelum River in Jammu and Kashmir, India, developed to harness hydroelectric energy in the Himalayan region.
-
E.
Karuma Hydropower Station
Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Baspa II Hydroelectric Project Triple: [Baspa River, hasHydroelectricProject, Baspa II Hydroelectric Project]
Generated description
Baspa II Hydroelectric Project is a run-of-the-river hydroelectric power plant in Himachal Pradesh, India, that harnesses the Baspa River to generate electricity.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Baspa II Hydroelectric Project Target entity description: Baspa II Hydroelectric Project is a run-of-the-river hydroelectric power plant in Himachal Pradesh, India, that harnesses the Baspa River to generate electricity.
-
A.
Karot Hydropower Project
The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
-
B.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
C.
Punatsangchhu-I Hydroelectric Project
Punatsangchhu-I Hydroelectric Project is a major run-of-the-river hydropower plant under construction in Bhutan, developed with Indian assistance to generate electricity for domestic use and export.
-
D.
Uri Hydroelectric Project
The Uri Hydroelectric Project is a major run-of-the-river power generation scheme on the Jhelum River in Jammu and Kashmir, India, developed to harness hydroelectric energy in the Himalayan region.
-
E.
Karuma Hydropower Station
Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68831e3648190a643c328122e4d43 |
completed | March 27, 2026, 1:37 p.m. |
| NER | Named-entity recognition | batch_69c6d8ac04e08190aa8011c0ade9d509 |
completed | March 27, 2026, 7:21 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69c742a841548190abd706ea1efd622f |
completed | March 28, 2026, 2:53 a.m. |
| NEDg | Description generation | batch_69c743a639f88190a0758194433322bf |
completed | March 28, 2026, 2:57 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69c7445fbd488190938ec3dd59cbeb2c |
completed | March 28, 2026, 3 a.m. |
Created at: March 27, 2026, 2:22 p.m.