Triple
T687033
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Georgia State Route 520 |
E13305
|
entity |
| Predicate | connectsTo |
P845
|
FINISHED |
| Object | Interstate 185 |
E335630
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 185 | Statement: [Georgia State Route 520, connectsTo, Interstate 185]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Interstate 185 Context triple: [Georgia State Route 520, connectsTo, Interstate 185]
-
A.
Interstate 185
chosen
Interstate 185 is a spur route of Interstate 85 in western Georgia that connects the Columbus area to the main interstate network.
-
B.
Interstate 215
Interstate 215 is a major auxiliary Interstate Highway in Southern California that serves as a bypass and connector route through the Inland Empire region.
-
C.
Interstate 215
Interstate 215 is a beltway freeway that partially encircles the Salt Lake City metropolitan area, providing a major route for regional traffic and access to key destinations.
-
D.
Interstate 82
Interstate 82 is a major U.S. highway in the Pacific Northwest that connects central Washington to northeastern Oregon, facilitating regional travel and commerce.
-
E.
Interstate 530
Interstate 530 is a spur highway in Arkansas that connects Pine Bluff to Little Rock, linking with Interstate 30 near the state capital.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4933e0f98819097d22766c49b61b8 |
completed | March 1, 2026, 7:27 p.m. |
| NER | Named-entity recognition | batch_69a4a093ac988190bb339616a3ed5adb |
completed | March 1, 2026, 8:24 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b2e7f3336c8190b0a9cd6f932bd3e0 |
completed | March 12, 2026, 4:21 p.m. |
Created at: March 1, 2026, 7:36 p.m.