Triple

T6865114
Position Surface form Disambiguated ID Type / Status
Subject Lockheed U-2 E158380 entity
Predicate takeoffAndLandingCharacteristic P55418 FINISHED
Object requires chase car for landing assistance LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: requires chase car for landing assistance | Statement: [Lockheed U-2, takeoffAndLandingCharacteristic, requires chase car for landing assistance]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: takeoffAndLandingCharacteristic
Context triple: [Lockheed U-2, takeoffAndLandingCharacteristic, requires chase car for landing assistance]
  • A. takeoffCharacteristic
    Indicates the specific properties or conditions associated with how an entity takes off, such as its manner, performance, or requirements during takeoff.
  • B. takeoffDistanceCharacteristic
    Indicates the relationship between an aircraft (or flight operation) and a characteristic describing the distance required or used for takeoff.
  • C. takeoffMethod
    Indicates the method or procedure by which an aircraft or object initiates its takeoff from a surface or launch point.
  • D. shortTakeoffAndLandingCapability
    Indicates that an entity has the ability to take off and land safely on runways or surfaces that are significantly shorter than standard operational requirements.
  • E. hasLandingConditions chosen
    Indicates the specific conditions or requirements that must be met for a landing to occur or be permitted.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c68831e3648190a643c328122e4d43 completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6da3ce95081909a424ac04bc7fa07 completed March 27, 2026, 7:27 p.m.
PD Predicate disambiguation batch_69c6d7b168908190b2f7c724b1bc7fc9 completed March 27, 2026, 7:17 p.m.
Created at: March 27, 2026, 2:21 p.m.