Triple

T6838356
Position Surface form Disambiguated ID Type / Status
Subject Plavinas Hydroelectric Power Plant E157506 entity
Predicate partOf P40 FINISHED
Object Baltic power system E615714 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Baltic power system | Statement: [Plavinas Hydroelectric Power Plant, partOf, Baltic power system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Baltic power system
Context triple: [Plavinas Hydroelectric Power Plant, partOf, Baltic power system]
  • A. Baltic power grid chosen
    The Baltic power grid is the interconnected electricity transmission network serving the Baltic states of Estonia, Latvia, and Lithuania, linking their power systems with neighboring regions.
  • B. Baltic Sea naval defense system
    The Baltic Sea naval defense system is a network of coastal fortifications, naval bases, and maritime defenses designed to protect strategic access routes and coastlines in the Baltic Sea region.
  • C. BALTIC
    BALTIC is a major contemporary art centre housed in a converted flour mill on the south bank of the River Tyne in Gateshead, England.
  • D. Riga Hydroelectric Power Plant
    Riga Hydroelectric Power Plant is a major hydroelectric facility in Latvia that generates electricity for the region using the flow of the Daugava River.
  • E. Latvenergo
    Latvenergo is Latvia’s state-owned energy utility company, serving as a major producer and supplier of electricity and heat in the Baltic region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6882c53608190b99aebef079b23bd completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6d67ee1c88190b82a9b6b3d1e3875 completed March 27, 2026, 7:11 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7240321108190860e91ebeb738a8f completed March 28, 2026, 12:42 a.m.
Created at: March 27, 2026, 2:19 p.m.