Triple

T6833250
Position Surface form Disambiguated ID Type / Status
Subject Successive Over-Relaxation E157387 entity
Predicate isLinearIteration P58204 FINISHED
Object true LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Successive Over-Relaxation, isLinearIteration, true]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isLinearIteration
Context triple: [Successive Over-Relaxation, isLinearIteration, true]
  • A. isLinear
    Indicates that a relationship, function, or structure preserves linearity, typically meaning it satisfies additivity and homogeneity (or forms a straight-line dependence between variables).
  • B. canBeImplementedIteratively chosen
    Indicates that the given concept, algorithm, or process is capable of being realized using an iterative (loop-based) approach rather than, or in addition to, a recursive or non-iterative one.
  • C. isLinearRecurrenceOfOrder
    Indicates that one sequence or function is defined by a linear recurrence relation of a specified order, where each term is a linear combination of a fixed number of preceding terms.
  • D. isLoop
    Indicates that something forms or behaves as a closed, repeating cycle or path that returns to its starting point.
  • E. isDeterministic
    Indicates that the outcome of a process or function is fully determined by its inputs, with no randomness or variation between executions.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6882c53608190b99aebef079b23bd completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6d62b1e8c8190a81d91191a54b073 completed March 27, 2026, 7:10 p.m.
PD Predicate disambiguation batch_69c6d09d95f0819091ca7f897dc21efe completed March 27, 2026, 6:46 p.m.
Created at: March 27, 2026, 2:18 p.m.