Triple

T6819818
Position Surface form Disambiguated ID Type / Status
Subject Stadium of Epidaurus E156868 entity
Predicate mainBuildingPhase P44772 FINISHED
Object Hellenistic period LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hellenistic period | Statement: [Stadium of Epidaurus, mainBuildingPhase, Hellenistic period]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: mainBuildingPhase
Context triple: [Stadium of Epidaurus, mainBuildingPhase, Hellenistic period]
  • A. mainConstructionPhaseUnder
    Indicates that one construction phase occurs under or is subordinate to another primary construction phase in a project’s timeline or hierarchy.
  • B. mainPhase
    Indicates that an event, action, or state occurs during the primary or central phase of a larger process or sequence.
  • C. constructionPhase chosen
    Indicates the specific stage or period an entity is in within an overall construction or building process.
  • D. majorPhase
    Indicates that one phase is a primary or dominant stage within a larger process, lifecycle, or sequence.
  • E. processBuilding
    Indicates the action of performing operations or transformations on a building or building-related data.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c688298a288190af3f285d57f76bbe completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6d35781e88190a45d1386706d4422 completed March 27, 2026, 6:58 p.m.
PD Predicate disambiguation batch_69c6d09bb4f881909bf20c188cb3e8e1 completed March 27, 2026, 6:46 p.m.
Created at: March 27, 2026, 2:17 p.m.