Triple
T6806301
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Telugu–Kannada script family |
E156313
|
entity |
| Predicate | encodingStatus |
P73113
|
FINISHED |
| Object | components encoded in Unicode |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: components encoded in Unicode | Statement: [Telugu–Kannada script family, encodingStatus, components encoded in Unicode]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: encodingStatus Context triple: [Telugu–Kannada script family, encodingStatus, components encoded in Unicode]
-
A.
conversionStatus
Indicates the current state or outcome of a process in which one entity is transformed, converted, or transitioned into another form or status.
-
B.
submissionStatus
Indicates the current state or phase of a submitted item within a review or processing workflow.
-
C.
recordStatus
Indicates the current state or condition of a record within a system or process (e.g., active, inactive, pending, or archived).
-
D.
enteredStatus
Indicates that an entity has transitioned into or assumed a particular status or state.
-
E.
compositionStatus
Indicates the current state or phase of completion of a composition or creative work, such as whether it is planned, in progress, revised, or finalized.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69c68826e6a48190a3d220b541e639de |
completed | March 27, 2026, 1:37 p.m. |
| NER | Named-entity recognition | batch_69c6d3082dcc8190a84bc056236cc52e |
completed | March 27, 2026, 6:57 p.m. |
| PD | Predicate disambiguation | batch_69c6d099bf08819089a9f9894d037e74 |
completed | March 27, 2026, 6:46 p.m. |
| PDg | Predicate description generation | batch_69c6d2a8f9188190abbb8c730e7b5edf |
completed | March 27, 2026, 6:55 p.m. |
Created at: March 27, 2026, 2:16 p.m.