Triple
T675939
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | General Electric |
E13076
|
entity |
| Predicate | spunOff |
P1257
|
FINISHED |
| Object | GE Vernova |
E83346
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: GE Vernova | Statement: [General Electric, spunOff, GE Vernova]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: GE Vernova Context triple: [General Electric, spunOff, GE Vernova]
-
A.
GE Vernova
chosen
GE Vernova is General Electric’s energy-focused business, encompassing power generation, grid, and renewable energy technologies and services.
-
B.
Engie
Engie is a major French multinational utility company specializing in electricity, natural gas, and energy services, with a strong focus on renewable and low-carbon energy solutions.
-
C.
Tesla, Inc.
Tesla, Inc. is an American electric vehicle and clean energy company known for pioneering mass-market electric cars, advanced battery technology, and autonomous driving innovations.
-
D.
Tesla Powerpack
Tesla Powerpack is a commercial and utility-scale lithium-ion battery energy storage system designed to store electricity, support grid stability, and enable large-scale renewable energy integration.
-
E.
Tesla Megapack
The Tesla Megapack is a large-scale, utility-grade lithium-ion battery system designed to store energy for the electrical grid and support renewable power integration.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a4933d3bf88190972041cd8cf143b9 |
completed | March 1, 2026, 7:27 p.m. |
| NER | Named-entity recognition | batch_69a4a04b2ae881908a5c23453bef8572 |
completed | March 1, 2026, 8:23 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69a5dc9f5f7c8190a766c6b545d1abd8 |
completed | March 2, 2026, 6:53 p.m. |
Created at: March 1, 2026, 7:36 p.m.