Triple

T6746134
Position Surface form Disambiguated ID Type / Status
Subject Arlon E154217 entity
Predicate roadServedBy P385 FINISHED
Object E411 motorway E816676 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: E411 motorway | Statement: [Arlon, roadServedBy, E411 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: E411 motorway
Context triple: [Arlon, roadServedBy, E411 motorway]
  • A. E411 motorway chosen
    The E411 motorway is a major European route in Belgium connecting Brussels with Luxembourg and serving key towns such as Wavre and Namur.
  • B. E42 motorway
    The E42 motorway is a major European route running across Belgium, connecting key cities and regions as part of the trans-European road network.
  • C. A41 motorway
    The A41 motorway is a major French highway in the Alps that connects the cities of Grenoble, Chambéry, and Annecy, serving as a key north–south route through the region.
  • D. E40 motorway
    The E40 motorway is a major trans-European highway stretching from Calais in France across multiple countries to Kazakhstan, serving as a key east–west transport corridor.
  • E. E19 motorway
    The E19 motorway is a major European route running through Belgium and the Netherlands, linking cities such as Brussels and Amsterdam as part of the trans-European road network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6880ef37881909268a5a7299b9293 completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6d1b8a0f0819086b802983e8ffcb6 completed March 27, 2026, 6:51 p.m.
NED1 Entity disambiguation (via context triple) batch_69d1d583f75c819083cb0dcdf265d735 completed April 5, 2026, 3:22 a.m.
Created at: March 27, 2026, 2:10 p.m.