Triple

T6740945
Position Surface form Disambiguated ID Type / Status
Subject Lansdowne Road railway station E154077 entity
Predicate near P350 FINISHED
Object River Dodder E254023 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: River Dodder | Statement: [Lansdowne Road railway station, near, River Dodder]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: River Dodder
Context triple: [Lansdowne Road railway station, near, River Dodder]
  • A. River Dodder chosen
    The River Dodder is a major river in Dublin, Ireland, known for flowing through the city’s southern suburbs before joining the River Liffey.
  • B. River Suir
    The River Suir is a major river in southern Ireland that flows through the province of Munster, passing cities such as Clonmel and Waterford before reaching the sea.
  • C. River Moy
    The River Moy is a renowned salmon-fishing river in western Ireland that flows through County Mayo before entering the Atlantic Ocean at Killala Bay.
  • D. River Fergus
    River Fergus is a river in County Clare, Ireland, that flows through Ennis before joining the River Shannon.
  • E. River Deel
    River Deel is a river in Ireland known as a tributary of the River Boyne, flowing through County Westmeath and County Meath.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c6880d84d8819095d19de2295f26ac completed March 27, 2026, 1:37 p.m.
NER Named-entity recognition batch_69c6d18971e081908372cd25d52a11bd completed March 27, 2026, 6:50 p.m.
NED1 Entity disambiguation (via context triple) batch_69c7e4fd792481909251c8749d7a11a3 completed March 28, 2026, 2:26 p.m.
Created at: March 27, 2026, 2:10 p.m.